Ref |
Description |
Our Price |
| K17 |
NER / LNER / BR Q7 0-8-0 |
£95.00 |
K17 NER-T3/LNER/BR-Q7 0-8-0
The first of the class No. 901 hauled 1,402 tons during dynomometer
tests Westbound from Carlisle proving the power of the class. 15 engines
were built in total by Darlington, all lasting into BR days. An example
is preserved today. A whitemetal kit with jig drilled chassis.
Requires wheels gears and motor to complete.
KEY TO ICONS. |
|
Minimum radius |
|
Degree of difficulty, Beginner(A), Average complexity(B), Only for the experienced(C). |
|
Assembled valve gear |
|
CNC machined chassis |
Click Here to Return to the
index page
|
|
|